(1)任何预拌混凝土在未添加缓凝剂的情况下,都在1小时左右进入初凝状态,这时再进行混凝土浇注施工将影响混凝土的工程质量。因此全自动搅拌车运送预拌混凝土有其时间控制的输送半径。一般控制在1小时以内。从出料到卸料完毕的长时间为90分钟,且搅拌筒总转数不大于300转。如嫌原有的卸料槽不够长,需另外接长时,请用支柱将接长部分撑住。
(1) Any ready-mixed concrete will enter the initial setting state within about 1 hour without adding retarder, and then the concrete pouring construction will affect the engineering quality of concrete. Therefore, the transportation of ready-mixed concrete by automatic mixer truck has its time-controlled transportation radius. It is generally controlled within 1 hour. The long time from discharging to discharging is 90 minutes, and the total number of revolutions of mixing drum is not more than 300. If the original discharge chute is not long enough and needs to be extended additionally, please support the extended part with a strut.
(2)混凝土出料完毕后,应迅速对拌筒内部进行冲洗。
(2) After the concrete is discharged, the inside of the mixing drum shall be washed quickly.
注意:如不及时冲洗,不仅会造成拌筒内混凝土的粘结,使装载量减少,进料不畅,还会给机构带来故障,是事故的诱发因素。务必注意!
Note: if not washed in time, it will not only cause the binding of the concrete in the mixing drum, reduce the loading, and make the feeding not smooth, but also cause the failure of the mechanism, which is the inducing factor of the accident. Be careful!
(3)空车行驶时,拌筒应以与搅动行驶同样的转速回转。
(3) When the truck is running empty, the mixing drum shall rotate at the same speed as the stirring driving.
注意:搅拌车行驶时,如搅拌停止回转,则拌筒滚道与拌筒托轮上会产生压痕,并发生异常噪声。因此,务请注意。
Note: When the mixing truck is running, if the mixing stops rotating, there will be indentation and abnormal noise on the mixing drum raceway and the mixing drum supporting wheel. Therefore, please pay attention.
具体操作步骤如下:
The specific operation steps are as follows:
⑴准备工作准备好三根紧急驱动软管,卸下接管和接头盖。
(1) Prepare three emergency drive hoses, and remove the connecting pipe and connector cover.
⑵故障车(被驱动车)的操作
(2) Operation of faulty vehicle (driven vehicle)
①将故障车的发动机熄火;
① Shut down the engine of the faulty vehicle;
②将紧固螺母(左右各有一个)朝左旋松;
② Unscrew the fastening nuts (one on the left and one on the right) to the left;
③再将旋钮朝右旋转,直到不能再旋为止;
③ Turn the knob to the right again until it can no longer be turned;
④将高压软管从马达接头处卸下;
④ Remove the high-pressure hose from the motor connector;
⑤将紧急驱动软管接到马达接头上;
⑤ Connect the emergency drive hose to the motor connector;
⑥把紧急驱动软管上的接管与故障车卸下的高压软管相接,以防漏油。
⑥ Connect the connecting pipe on the emergency drive hose with the high-pressure hose removed from the faulty vehicle to prevent oil leakage.
⑶救援车(驱动车)的操作
(3) Operation of rescue vehicle (drive vehicle)
①将操作手柄于空档位置;
① Set the operating handle to the neutral position;
②将发动机熄火;
② Shut down the engine;
③将高压软管从高压油管处卸下;
③ Remove the high-pressure hose from the high-pressure oil pipe;
④将紧急驱动软管接到高压油管上;
④ Connect the emergency drive hose to the high-pressure oil pipe;
⑤用紧急驱动软管上的接头盖将驱动车的高压软管盖起,以防漏油。
⑤ Use the connector cap on the emergency drive hose to cover the high-pressure hose of the drive vehicle to prevent oil leakage.
⑷启动救援车的发动机。
(4) Start the engine of the rescue vehicle.
⑸将救援车的操作手柄拨“出料”位置,使故障车内的混凝土排出。
(5) Turn the operating handle of the rescue vehicle to the "discharge" position to discharge the concrete in the fault vehicle.
⑹紧急驱动完毕后,使两车各自恢复原状。
(6) After the emergency drive, restore the two vehicles to their original state.
工作时,不得将手伸入旋转的搅拌筒内,严禁将手伸入主卸料溜槽和加长卸料溜槽的连接部位,以免发生事故。以上就是给搅拌车在工作时应注意的问题,相信大家都已经有一定的学习了,希望大家在工作时一定要注意。关注我们http://www.zkzdsljbc.com了解更多事项!
When working, do not put your hands into the rotating mixing drum. Do not put your hands into the connection part of the main discharge chute and the extended discharge chute to avoid accidents. The above are the problems that should be paid attention to when the mixer is working. I believe that everyone has learned a lot. I hope you must pay attention when working. Follow us http://www.zkzdsljbc.com Learn more!