混凝土搅拌车洗洗更健康!

来源:http://www.zkzdsljbc.com/ 时间:2021-05-21

1.随车带上减水剂
1. Bring water reducing agent with the car
减水剂是一种在维持混凝土坍落度不变的条件下,能减少拌合用水量的混凝土外加剂,随车携带,能对混凝土进行很好的调节。不过在加入减水剂的时候,一定要记得有商砼站化验室的人在场,否则混凝土质量强度不够,驾驶员要承担后果。
Superplasticizer is a kind of concrete admixture which can reduce the amount of mixing water under the condition of maintaining the same slump of concrete. It can be carried with the car and can adjust the concrete well. However, when adding superplasticizer, we must remember that there are people in the laboratory of commercial concrete station, otherwise the concrete quality and strength are not enough, and the driver will bear the consequences.
2.回厂检查罐内水量
2. Return to the factory to check the water quantity in the tank
每次出车任务完成回到站内的时候,检查储水罐内的水量,让水罐中的水随时处于满罐的状态,以备不时之需。
Every time you return to the station after completing the task, check the water quantity in the water storage tank. It's better to keep the water in the tank full at any time in case of emergency.
混凝土搅拌车
3.离厂前检查混凝土质量
3. Check the concrete quality before leaving the factory
可能会因为原料的不同,每一盘混凝土质量都会有变化。在装好混凝土离场时,一定要检查罐内混凝土的塌落度情况以及和易度,小心混凝土的提前凝结和混凝土分层沉淀。
The quality of each plate of concrete may change due to different raw materials. When loading the concrete and leaving the site, it is necessary to check the slump and workability of the concrete in the tank, and be careful of the early setting and layered precipitation of the concrete.
4.减少车辆行驶时间
4. Reduce vehicle travel time
混凝土运距一般在直径30范围以内,出车之前规划好路线以及车辆通行情况,尽量减少车辆在路上的时间。
The concrete transportation distance is generally within the range of 30km in diameter. Before driving, the route and vehicle traffic conditions should be planned to minimize the time of vehicles on the road.
5.减少损失先卸料
5. Reduce loss and discharge first
如果遇到人为因素或者不可抗因素,导致长时间无法卸料的情况,应随时查看罐内混凝土情况,一旦发现混凝土开始凝结。在报备负责人之后立刻进行卸料,以防整个罐体报废。据了解,市面上12方的罐体,不算人工以及误工费用,价格在8万左右。
In case of failure to unload for a long time due to human factors or irresistible factors, the concrete condition in the tank should be checked at any time. Once it is found that the concrete begins to set. Discharge immediately after reporting to the person in charge to prevent the whole tank from being scrapped. It is understood that the price of 12 square tanks on the market is about 80000, excluding labor and work delay costs.
上一篇:搅拌车的操作应该注意什么?
下一篇:小型混凝土搅拌车驱动点有哪些?
tag:混凝土搅拌车,小型混凝土搅拌车,全自动混凝土搅拌车
当前位置: 首页 - 新闻资讯 > 公司新闻

混凝土搅拌车洗洗更健康!

作者:中科聚峰混凝土搅拌车厂家 时间:2021-05-21

1.随车带上减水剂
1. Bring water reducing agent with the car
减水剂是一种在维持混凝土坍落度不变的条件下,能减少拌合用水量的混凝土外加剂,随车携带,能对混凝土进行很好的调节。不过在加入减水剂的时候,一定要记得有商砼站化验室的人在场,否则混凝土质量强度不够,驾驶员要承担后果。
Superplasticizer is a kind of concrete admixture which can reduce the amount of mixing water under the condition of maintaining the same slump of concrete. It can be carried with the car and can adjust the concrete well. However, when adding superplasticizer, we must remember that there are people in the laboratory of commercial concrete station, otherwise the concrete quality and strength are not enough, and the driver will bear the consequences.
2.回厂检查罐内水量
2. Return to the factory to check the water quantity in the tank
每次出车任务完成回到站内的时候,检查储水罐内的水量,让水罐中的水随时处于满罐的状态,以备不时之需。
Every time you return to the station after completing the task, check the water quantity in the water storage tank. It's better to keep the water in the tank full at any time in case of emergency.
混凝土搅拌车
3.离厂前检查混凝土质量
3. Check the concrete quality before leaving the factory
可能会因为原料的不同,每一盘混凝土质量都会有变化。在装好混凝土离场时,一定要检查罐内混凝土的塌落度情况以及和易度,小心混凝土的提前凝结和混凝土分层沉淀。
The quality of each plate of concrete may change due to different raw materials. When loading the concrete and leaving the site, it is necessary to check the slump and workability of the concrete in the tank, and be careful of the early setting and layered precipitation of the concrete.
4.减少车辆行驶时间
4. Reduce vehicle travel time
混凝土运距一般在直径30范围以内,出车之前规划好路线以及车辆通行情况,尽量减少车辆在路上的时间。
The concrete transportation distance is generally within the range of 30km in diameter. Before driving, the route and vehicle traffic conditions should be planned to minimize the time of vehicles on the road.
5.减少损失先卸料
5. Reduce loss and discharge first
如果遇到人为因素或者不可抗因素,导致长时间无法卸料的情况,应随时查看罐内混凝土情况,一旦发现混凝土开始凝结。在报备负责人之后立刻进行卸料,以防整个罐体报废。据了解,市面上12方的罐体,不算人工以及误工费用,价格在8万左右。
In case of failure to unload for a long time due to human factors or irresistible factors, the concrete condition in the tank should be checked at any time. Once it is found that the concrete begins to set. Discharge immediately after reporting to the person in charge to prevent the whole tank from being scrapped. It is understood that the price of 12 square tanks on the market is about 80000, excluding labor and work delay costs.