1. 在起动混凝土搅拌罐车之前,必须进行检查。
1. Before starting the concrete mixing tank truck, a comprehensive inspection must be carried out.
2. 检查汽车轮胎气压及磨损情况,按规定力矩紧固轮胎螺丝、轮胎气压补充到该车型规定值之内,根据磨损情况进行轮胎换位。
2. Check the tire pressure and wear condition, tighten the tire screw according to the specified torque, add the tire pressure to the specified value of the vehicle, and transpose the tire according to the wear condition.
3. 检查发电机、空调、水泵及助力泵皮带的松紧与老化情况。
3. Check the tightness and aging of the belt of generator, air conditioner, water pump and booster pump.
4. 检查汽车前后车灯是否齐全(包括:大灯、视宽灯、转向灯、刹车灯、倒车灯及雾灯)。
4. Check whether the front and rear lamps of the car are complete (including: headlamp, width lamp, steering lamp, brake lamp, reversing lamp and fog lamp).
5. 检查发电机、空调、水泵及助力泵皮带的松紧与老化情况。
5. Check the tightness and aging of the belt of generator, air conditioner, water pump and booster pump.
6. 检查电瓶液面及玻璃清洗剂罐的液面。
6. Check the liquid level of the battery and the glass cleaner tank.
7. 检查转向助力油罐的油面是否符合规定,检查系统各油管接口是否有渗油现象。
7. Check whether the oil level of the power steering oil tank meets the requirements, and check whether there is oil leakage at each oil pipe interface of the system.
8. 检查制动器及离合器液面位置。
8. Check the liquid level of brake and clutch.
9. 检查汽车冷却液液面位置是否符合规定。
9. Check whether the vehicle coolant level meets the requirements.
10. 做好检查后,规范行驶搅拌车。
10. After the inspection, drive the mixer in a standard way.
11. 混凝土搅拌罐车起动发动机后,应使搅拌筒在低速下转动10分钟左右,使液压油温升到20℃以上方可工作。
11. After starting the engine of the concrete mixing tank truck, the mixing drum should be turned at low speed for about 10 minutes to make the hydraulic oil temperature rise to above 20 ℃.
12. 搅拌车装运搅拌好的混凝土时,搅拌筒转速为210转/分,在运输过程中,平坦路面上搅拌筒转速保证在2-3转/分,行驶在侧坡度大于50的路面,或左右晃动较大的路面时,应停止搅拌旋转,待路况好转后再恢复搅拌旋转。
12. When the mixer truck transports the mixed concrete, the rotation speed of the mixing drum is 210 rpm. During transportation, the rotation speed of the mixing drum on the flat road should be 2-3 rpm. When driving on the road with side slope greater than 50 or the road with large left and right shaking, the mixing rotation should be stopped, and the mixing rotation should be resumed after the road condition improves.
13. 混凝土搅拌车运送混凝土的时间不能超过搅拌站规定的时间。运送混凝土途中,搅拌筒不得长时间停转,以防混凝土产生离析现象。应时常观察混凝土情况,发现异常及时通报调度室,申请作出处理。
13. The delivery time of concrete by concrete mixer truck shall not exceed the specified time of mixing plant. During the transportation of concrete, the mixing drum shall not stop for a long time to prevent concrete segregation. The concrete condition shall be observed from time to time, and any abnormality found shall be timely reported to the dispatching room for handling.
14. 搅拌车在排出混凝土之前,应使搅拌筒在10-12转/分的转速下转动1分钟,再进行排料。
14. Before discharging the concrete, the mixer should rotate the mixing drum at the speed of 10-12 rpm for 1 minute before discharging.
15. 混凝土搅拌车出料完毕后,应立即用随车的软管放水将进料口、出料斗及出料溜槽等部位冲洗干净,排去粘结在车身各处的污物及残留混凝土,再向搅拌筒内注水150-200L的清水,在返回途中要让搅拌筒慢速转动,以清洗内壁,避免残余料渣附在筒壁和搅拌叶上,并在再一次装料前将这些水放掉。
15. After the discharge of concrete mixer truck, the feeding port, discharge hopper and discharge chute shall be cleaned immediately with the hose attached to the truck, and the dirt and residual concrete bonded to the truck body shall be removed. Then, 150-200l clean water shall be injected into the mixing drum. On the way back, the mixing drum shall rotate slowly to clean the inner wall, so as to avoid the residual slag adhering to the wall and mixing blade, And discharge the water before loading again.